|
Working with a Civil Engineering team lead by Peed & Bortz in Christiansburg, Virginia, Master Engineers performed the Structural, Mechanical and Electrical design of a new 800 square foot electrical distribution building. Phase I of this project consisted of the design of this new building as well as the Electrical infrastructure design of new service entrance switchgear and optional standby 1750kW diesel generation system.
|